
The new Group offices are comfortable and rational environments in which to work and favour interaction between the various work teams.
| THE PRODUCTION COMPLEX | ||
![]() [Look at gallery] |
Opened in December 2009, the new AB facility of Orzinuovi covers about 25,000 square metres of enclosed area. The entire production process has been planned and organised along a route defined to optimise each phase: steel structures, setting up of container modules, motor fitting, wiring and assembly of electric and hydraulic parts, testing and shipment. Work in the production facility is distinguished by technological innovation, from the use of an automatic warehouse up to the fully-independent building heating system, fuelled by the adjacent bio-cogeneration plant. |
| THE ENGINEERING COMPLEX | ||
![]() [Look at gallery] |
The AB management and operating area is completed by two new buildings accommodating the headquarters of AB Energy, AB Engineering and AB Service, forming an industrial complex completely focalised on cogeneration, the only facility of this type in Europe. Altogether, the surface at disposal is over 5,000 sq m, in which more than 200 people work, including engineers, technical personnel, sales and administrative staff, in a comfortable and functional environment. The architecture of the new complex has been purposely designed to harmonize with the other buildings making up the AB industrial complex, while always conveying a specific and unmistakable personality of its own. |