THE CENTRAL KEY OF A PROCESS THAT IS DEVELOPED IN OVER 40.000mq FACTORIES

Opened in 2009, the establishment of AB in Orzinuovi spreads over about 30,000 square meters indoors, where the entire production process is planned and organized along a defined path to optimize each stage: carpentry, containerized construction modules, engine placement, wiring, electrical assembly, hydraulic testing and shipping.

It is a space which is characterized by structural and organizational choices to work better and produce quality.

It is the central pivot of an industrial area of over 40,000 square meters, where the engineering facilities and management of the Group are housed.

Technological innovation characterizes the plant’s work, from the use of an automatic warehouse to the choice of fully autonomous thermal buildings, guaranteed by the adjacent bio-cogeneration plant that supplies the underfloor heating of the workshop and offices, as well the summer air conditioning.

PRODUCTION PLANT
40.000 M2

The largest area in the world dedicated to the production of cogeneration systems.

PRODUCTION CAPACITY
300 SYSTEMS IN ONE YEAR

Every year, AB engineers and builds up to 300 systems in its factories.

“The largest area in the world dedicated to the production of cogeneration systems”.